Lower the basement floor and add real ceiling height, engineered and permitted.
Service highlights

A structural engineer designs the underpinning sequence before anything is dug.

Sections are dug and poured in sequence so the structure above stays fully supported.

New slab poured to the lowered height, ready for a finished basement or suite.
Why it matters

Engineered & warrantied execution by JKRC crews.
Adds legal ceiling height for a basement suite
Increases usable square footage without a home addition
Engineered and permitted, not just excavated
Questions

Speak directly with an experienced project manager or schedule a site visit.
Typically [12–24] inches, engineer-dependent.
Most homes take [6–10] weeks.
Yes — we pull permits and coordinate engineering and inspections.